HAZZARD
CEG'er
I thought I would start a thread for the progress of my 3L build from start to finnish, as i go.
Im taking many detailed pictures every step of the way, but I will only be posting a few of them. If you want to see more just ask and I will post whatever i have.
Hopefully this wont take long!!
This is what I started with
1999 CSVT in great shape for $500
less than 12 hours after I got it.
and 6 hours after that.
lots of down time this weekend so i have been cleaning parts.
everything laid out on my garage floor.
cleaning the lower intake
Im taking many detailed pictures every step of the way, but I will only be posting a few of them. If you want to see more just ask and I will post whatever i have.
Hopefully this wont take long!!
This is what I started with
1999 CSVT in great shape for $500



less than 12 hours after I got it.

and 6 hours after that.

lots of down time this weekend so i have been cleaning parts.
everything laid out on my garage floor.

cleaning the lower intake
