You do know Ford made CNG contours for fleet use, right? Fricken noob.![]()
really... no I did not...
You do know Ford made CNG contours for fleet use, right? Fricken noob.![]()
Updates:
Mike and I spent a lot of time Tuesday scratching our heads and brainstorming and I think we’ve got a schedule pretty well outlined to get this thing done in time(albeit not exactly how I wanted for SZ).
I should be receiving my solid sub frame bushings this weekend (thanks Tony). Which means the front sub frame is ready for assembly.
This Monday/Tuesday is engine bay detailing and final cleanup before assembly begins. Some paint will fly these days as well.
Wednesday and Friday I’m going to start tearing into wiring….have a few electrical systems and wires to remove.
Next weekend(12/13) is when the real fun begins…
Front sub frame seam welding, paint, install
Rad. Install
Front suspension install, control arm mock-up
Rear sub frame install, control arm mock-up (pending parts swap from BLKOUT2)
Picking up the 3L
…more to come as the scramble continues.
for your wiring talk to terry . he just went and pruned his harness and systems inside. i believe he used a svt harness as a guine pig.
linkage
I've been talking to Terry for months now.
Picked up the solid sub frame bushings and they fit freaking perfect, still welding them in, but damn do they fit/look great! Pics tomorrow i think.
for your wiring talk to terry . he just went and pruned his harness and systems inside. i believe he used a svt harness as a guine pig.
linkage
Updates:
Mike and I spent a lot of time Tuesday scratching our heads and brainstorming and I think we’ve got a schedule pretty well outlined to get this thing done in time(albeit not exactly how I wanted for SZ).
I should be receiving my solid sub frame bushings this weekend (thanks Tony). Which means the front sub frame is ready for assembly.
This Monday/Tuesday is engine bay detailing and final cleanup before assembly begins. Some paint will fly these days as well.
Wednesday and Friday I’m going to start tearing into wiring….have a few electrical systems and wires to remove.
Next weekend(12/13) is when the real fun begins…
Front sub frame seam welding, paint, install
Rad. Install
Front suspension install, control arm mock-up
Rear sub frame install, control arm mock-up (pending parts swap from BLKOUT2)
Picking up the 3L
…more to come as the scramble continues.
You forgot the most important part... My SVT hits the road again this weekend. w00t :crazy:
hmmmmm, I will talk to booty about it![]()
I can get off on saturday if you want another hand?
I could bring my booty too...![]()